Guide

Kitchen Remodel Cost in Portland (2026): Price Per Square Foot and What Drives It

Real budget bands from projects we have built in Portland, Lake Oswego, West Linn and Vancouver, WA — not national averages.

(971) 274-6599

Quick Answer

A full design-build kitchen remodel in Portland typically runs $75,000 to $250,000 in 2026, or roughly $350 to $700 per square foot. Keeping the existing layout with semi-custom cabinets sits at the bottom of that range; moving walls, relocating plumbing and gas, and specifying full-custom cabinetry with high-end appliances pushes it to the top. Construction usually takes 10 to 16 weeks after design and permitting.

Masters Construction (also listed as Masters Construction Group) is a design-build general contractor serving Portland, Lake Oswego, West Linn, and Vancouver, WA.

Kitchen pricing is the question we get on almost every first call. The honest answer is that a kitchen is not one number — it is a stack of decisions, and a handful of them account for most of the spread between a $80,000 project and a $240,000 one. This guide lays out the bands we actually contract at in 2026, what moves a budget between them, what the city requires, and how long the work takes.

Every figure here reflects completed design-build kitchens in Portland, Lake Oswego, West Linn, Beaverton and Vancouver, WA. For pricing across every room type, see our Portland and Vancouver remodeling cost guide.

How much does a kitchen remodel cost in Portland in 2026?

Our typical design-build kitchen range is $75,000 to $250,000. That figure covers design, drawings, permits, demolition, construction, cabinetry, counters, tile, lighting, plumbing, electrical and finish work — the complete project under one contract, not a cabinet quote with the rest left open.

Three bands cover nearly every kitchen we price:

  • $75,000-$110,000 — keep the layout. Cabinets, counters, backsplash, flooring, lighting and appliances are replaced in place. Semi-custom cabinetry, quartz counters, no wall removal and no plumbing relocation. Common in 1990s and 2000s houses where the plan already works.
  • $110,000-$175,000 — new layout. The island moves or appears, the range wall changes, plumbing and electrical get relocated, lighting is redesigned with new circuits, and cabinetry is custom or high-end semi-custom. This is where most Portland kitchen remodels land.
  • $175,000-$250,000 and up — structural and full custom. A bearing wall comes out with an engineered beam, the kitchen opens into dining or living space, appliances are professional-grade, cabinetry is fully custom millwork, and counters are natural stone with a waterfall edge or a full-height slab backsplash.

What is the kitchen remodel cost per square foot in Portland?

For full design-build kitchens we see roughly $350 to $700 per square foot of kitchen floor area. A 200 sq ft kitchen at $500 per sq ft lands near $100,000; the same kitchen with structural work and custom millwork can reach $700 per sq ft or more.

Treat per-square-foot as a sanity check, not a quote. A kitchen's cost is concentrated in fixed items — cabinetry runs, appliances, plumbing fixtures, a stone slab, a lighting plan — and those do not shrink proportionally when the room does. A compact 140 sq ft galley with a professional range and custom cabinets can carry a higher per-foot number than a 300 sq ft kitchen with a simpler specification.

The number is most useful in reverse: once you have a target budget, dividing it by your kitchen's square footage tells you quickly which band you are shopping in.

What drives the price of a kitchen remodel?

In rough order of impact on the contract price:

  • Cabinetry: 30-40% of the typical kitchen budget. Stock to semi-custom to full custom is the single largest lever. Custom millwork buys exact fit, real wood interiors and a finish that matches your trim, and it commonly doubles the cabinet line.
  • Labor and project management: skilled carpentry, tile setting, electrical and plumbing trades, plus a dedicated project lead coordinating the sequence. In the Portland market this is a substantial and non-negotiable share of the budget.
  • Layout changes: moving a sink, range or refrigerator means new supply, waste, venting, gas and circuits. Each relocation adds trade time, inspections and often floor or ceiling access work.
  • Structural work: removing a bearing wall requires an engineer, a beam, shoring and inspection — typically $15,000-$40,000 depending on span and load path.
  • Appliances: a builder-grade package and a professional package can differ by $30,000 or more, and professional ranges usually require larger venting, dedicated circuits or a gas line upgrade.
  • Countertops and tile: quartz, quartzite and marble differ sharply in slab price and fabrication. Full-height slab backsplashes and waterfall ends add both material and fabrication labor.
  • Permits and drawings: modest in dollars relative to the whole, but they set the schedule — see the permit section below.

Where can you save on a Portland kitchen remodel?

The savings that actually hold up do not come from cutting corners on labor or waterproofing. They come from scope discipline:

Keep the plumbing where it is. Leaving the sink and range on their existing walls removes a meaningful block of trade time and can keep a project out of a permit that would otherwise be required.

Choose semi-custom cabinetry with select custom pieces. A semi-custom run with one custom hutch or island reads as bespoke at a fraction of the full-custom cost.

Mix material grades. A quartzite island paired with quartz perimeter counters keeps the statement surface and trims the slab count.

Use a vetted palette. Our designers keep a curated set of cabinet lines, tile, hardware and fixtures we know price and install predictably, which shortens selections and avoids specification surprises.

Do not save by skipping design. Deciding on paper is cheap; deciding mid-construction is a change order. Our approach to that is described in our design-build process, and the full picture of what our contracts include is on our pricing page.

Do you need a permit for a kitchen remodel, and what does it cost?

In Portland, permits are issued by Portland Permitting & Development (formerly BDS). You generally need a permit when you move or add plumbing, gas or electrical, alter a wall, change the structure, or modify ventilation. A pure cosmetic replacement — same cabinets in the same places, same fixture locations, new counters and paint — often does not.

Permit fees on a residential kitchen are typically a low four-figure sum including trade permits and plan review, and they scale with valuation. The real cost is calendar time, not money: a straightforward trade permit can be quick, while a structural review runs several weeks to a few months depending on workload.

We prepare the drawings, submit them, answer plan-review comments and schedule every inspection. You do not stand in line at a permit counter.

How long does a kitchen remodel take?

Construction is 10 to 16 weeks for a full kitchen. Demolition and structure take one to two weeks; rough plumbing, electrical and HVAC with inspections take two to three; insulation, drywall and paint prep another two; cabinetry installation two; counters require templating after cabinets are set, then one to three weeks of fabrication; tile, lighting, appliances, hardware and punch list fill the rest.

Ahead of that, design runs 4 to 8 weeks and permitting runs 2 to 12 weeks depending on whether structural review is involved. From the first site walk to the first meal cooked, plan on five to eight months for a project with layout changes.

We order cabinetry and long-lead appliances during permitting rather than after, which is usually what separates a 12-week kitchen from a 20-week one.

What does a kitchen remodel cost in Lake Oswego, West Linn and Vancouver, WA?

The same $75,000-$250,000 range applies across the metro. Labor and material pricing does not change meaningfully between Portland and its suburbs; scope does.

Lake Oswego and West Linn kitchens skew toward the upper bands because the houses are larger, the kitchens are bigger, and clients more often combine the kitchen with an adjacent great room or a structural opening. Lake Oswego permits go through the city's Building Division; West Linn through Planning & Building. Reviews in both are commonly faster than Portland's on non-structural work.

In Vancouver and the rest of Clark County, Washington, pricing matches Oregon but the process differs: permits are issued by the City of Vancouver or Clark County depending on address, Washington sales tax applies to materials and labor in a way Oregon's does not, and review timelines are often shorter than Portland's. See our Vancouver, WA remodeling page for local detail.

Is a kitchen remodel worth it in Portland?

For resale, a kitchen remodel rarely returns every dollar, and anyone who tells you it returns 100% is selling something. In the Portland market a well-executed kitchen typically recovers a meaningful share of its cost at sale and, more importantly, makes the house sell — dated kitchens are the single most common reason a listing sits.

For livability the math is different. The kitchen is the room most households use several hours a day for a decade or more. Spread across that, the difference between a $110,000 kitchen and a $160,000 one is small per year, and it is the difference you notice every morning.

The case is strongest when the remodel fixes how the house works — opening a closed kitchen to the living space, adding a real island, fixing traffic flow — and weakest when it is finishes alone in a plan that already frustrates you. If you are considering broader work, our kitchen remodeling service page and the whole-home renovation guide cover the next step up.

Frequently Asked

Frequently Asked Questions

What homeowners ask us most about this work.

A full design-build kitchen remodel in Portland typically costs $75,000 to $250,000 in 2026. Keeping the layout with semi-custom cabinets runs $75,000-$110,000; a new layout with custom cabinetry runs $110,000-$175,000; structural changes with full-custom millwork and professional appliances run $175,000-$250,000 and up.

Talk Through Your Project

Tell us about the house and we’ll walk the site, talk through scope, and give you a realistic range — no obligation.

(971) 274-6599

CCB #248237 · Licensed in Oregon & Washington

Call